Lodge Rd Sewer Forcemain - Partial Twinning

See our Construction Superintendent chat about this project:

June 29 - end August: Construction of a new sewer main (Lodge Rd. to McCarthy Rd.)

Image

Please obey any traffic control measures.  Rail Trail week day detour still in effect. Please watch for updates on the District's social media channels 

As of the end of August the forcemain pipe installation in nearly complete and tie-in's to existing infrastructure are being installed. This project is being completed by the District of Lake Country in-house construction and operations team, and the site is being managed by the District's Construction Superintendent in conjunction with Engineering staff.  On Monday Aug. 24th the first tie-in was successfully completed, with crews working over the night to minimize disruption and risk while pipe flows are typically at lowest volume.

The Lodge Rd. Sewer Forcemain Partial Twinning project is being constructed to increase system capacity and provide critical redundancy through the installation of a second, upsized, forcemain parallel to the existing forcemain. The forcemain is being installed from the Lodge Road lift station to the intersection of Lodge Rd and the rail trail, following adjacent to the rail trail to the McCarthy Rd. egress, then east along the egress. 

For  general inquiries about all District projects and services please contact: [email protected] or submit a concern by webform Service Request & Report a Problem | District of Lake Country

To see this project on an interactive map please visit  District Projects

 

Alternate Route Rail Trail detour:

For public safety, efficiency of construction timelines and availability of equipment and crew, 900 metres of the rail trail, between Lodge Rd. and McCarthy Rd, remains under detour during week days only throughout construction.  For trail users, alternate routing is available via Lodge Rd. and Bottom Wood Lake Rd. using the regular roadways and sidewalks.

Image

Alternate Route during weekday Rail Trail closures

Tie-In to Existing Infrastructure Completed at Night

Image
night work tie in

Thank you to our crews for working through the night to complete a tie-in
Image
crews complete tie-in overnight

Forcemain Installed:

Image

Forcemain installed
Image
image of welding

trench weld
Image
image of work in progress

Project work continues

 