Please note, we are currently administering a high volume of development and building applications which is impacting our processing times. Thanks for your patience as we address building inspections and development applications in the order they are received. To help us respond as effectively as possible, please ensure any correspondence contains a reference to the relevant development application file number, the civic address, legal description or roll number of the property and any specific questions.
Building Permits
You need a building permit for any construction, addition, alteration, change of use or demolition of a building or structure. An accessory building that is less than ten square meters (approximately 107 square feet), which does not create a hazard is exempt. Please check the appropriate zoning requirements as they apply whether or not a building permit is required.
What is a building permit? |
A building Permit is formal permission from the District to start a building project. We must review your permit plans to make sure they follow the BC Building Code, Zoning Bylaw, Building Regulation Bylaw and other regulations. |
Active building permits |
View the GIS map to see the basic information on the current building permits currently in progress in Lake Country. To check on the status of a current application, view Building Permit Application Status. |
Why do I need a building permit? |
Permits make sure construction projects meet zoning requirements, fire and structural safety standards and other building standards required by the BC Building Code. Failure to get a building permit could result in costly delays, legal action and/or the removal of work already completed. |
How much are the fees? |
|
Who is responsible for obtaining a building permit? |
The owner is responsible for obtaining a permit although as the owner you can authorize your contractor in writing to apply for a permit for you. As the owner you must ensure your contractor has the permit before starting work. All required documentation must be submitted for a complete application. |
How do I apply for a building permit? |
The owner or person authorized in writing completes the Application for Building Permit, submits plans, specifications, fees, a certificate of title and other required document shown on the Building Application Checklist (attached to the above linked Application document). |
Building Application and Forms |
|
What is the process? |
We review complete applications and refer them to internal and/or external departments and agencies for comment. Incomplete applications are not accepted. Depending on the project additional applications, licences and permits may be required. The most commonly required permits are an Application for Access Permit or an Application for Water/Sewer connection. Once approved we advise the applicant when the permit is ready for pick up and what fees are owed. |
Checklists by Building Type |
|
Inspections |
You will receive a schedule of inspections with your building permit. When you're ready submit a Building Inspection Request or call 250-766-6676 to book an inspection and leave the following information:
|